Executive Summary 3



Troubles that occurred on the Project:

1. Inconsistency in the Survey Data. The survey is supposed to be between 2000 – 2018; there was no data for 2004, which caused the data not to make much sense.

2. Finding my KPI and able to tell a good story with it.



Click on the link below for a better understanding of DAX.

https://docs.microsoft.com/en-us/learn/paths/dax-power-bi/


Executive Summary 3



Troubles that occurred on the Project:

1. Inconsistency in the Survey Data. The survey is supposed to be between 2000 – 2018; there was no data for 2004, which caused the data not to make much sense.

2. Finding my KPI and able to tell a good story with it.



Click on the link below for a better understanding of DAX.

https://docs.microsoft.com/en-us/learn/paths/dax-power-bi/